|
Product Details:
Payment & Shipping Terms:
|
Steel Grade: | ASTM A572 Grade 50 | Surface Treatment: | Hot Dip Galvanization |
---|---|---|---|
Strcuture: | 4 Legs Steel Lattice Tower | Conductor Circuit: | Double Circuit |
Voltage: | 220KV | Style: | Cable Tower |
Highlight: | Angular Powerline Electricity Pylons,220KV Electricity Pylons,ASTM A572 Electricity Pylons |
220KV ASTM A572 Grade 50 Material Angular Powerline Electricity Pylons
1. Production decription
LT Steel Structure is experienced in design and manufacture all kind of Angular Powerline Electricity Pylons .
Usually a transmission Line tower consists of tower head ,tower body ,tower legs and tower foundation.
Tower material used Q345B ,Q235B in common ,according to the engineer design.
Products |
220KV ASTM A572 Grade 50 Material Angular Powerline Electricity Pylons |
Voltage Grade | 10~1000KV |
Material | ASTM A 572 Grade 50 ,A36 |
Height | 8-100m |
Galvanization | According with Chinese standard GB/T 13912-2002 Which is equal to American standard ASTM A123. |
Painting | According to clients' request |
Test | any test as requirement and test before shipment |
Certificates | ISO9001-2015, ISO14001:2015, OHSAS 45001:2015 |
Minimum order: | One set |
Fasteners | Grade 4.8,6.8 ,8.8 or as requirement |
Product list :
2. Product capacity
We have 5 auto production line for electric angle steel towers Manufacturing,We can supply 3000 tons angle steel tower
every month .Else we have enogh site for installing more production line if needed.
We also have plasma cutting machine ,14m bending machine and auto welding machines for pole towers .
3. Technical support
Our engineer and drawer has lots of designing ,lofting experience of lattice steel towers .
Which we can supply a overall solution of all the towers .
Service you can get from our engineer | tower design,tower lofting ,tower weight calculation and loading plans |
Software they used | TTA,STWXP,TMA,LMA,Daoheng |
4. Quality control
We have very strict quality control in every steel towers .
Material incoming control:chemical and physical test
Zinc coating thinknes inspection
We usually has two ways of trial assembly for lattice steel towers : trial assembly before galvanzation
and after galvanization.
6. Hot dip galvanization and painting
7. Package and delivery
Package we usually do as our clients requirment .Usually for angle steel towers,We use steel wire to make it into bundle and use special material to protect the Zinc.
Contact Person: Aggie
Tel: +86 18563978182